- ENI
- Detail Enginering
- Taranto
- 2012
Verification of the plant fire-fighting network. Sizing of foam premixer connected to storage tank containment basins. Detailed engineering for the insertion of 23 premixers.
Verification of the plant fire-fighting network. Sizing of foam premixer connected to storage tank containment basins. Detailed engineering for the insertion of 23 premixers.