- ENI
- Detail Design
- TARANTO
- 2016
Engineering activities aimed to update (as built) and designation of all pipe plants of the Trench Pipe and subsequent collation, using the surveys methodology with Laser Scanner
The activity included:
- Documents reserch
- Surveys on site
- Piping plant processing
- Updating and processing new sketches