Design for TAF unit interconnecting to Refinery

  • ENI
  • Detail Design
  • Sannazzaro De’ Burgondi
  • 2017

Detail engineering for TAF interconnecting.
The work included the following activities:
Document collection
• Survey on site
• Piping layout
• Tie-in list
• Axonometric
• Material List
• New cabin foundation
• Supports drawings
• Authorizations
• Work Direction
• Foundation plan
The work included:
• Electric engineering studies
• Atex classification and layout update
• HSEW
• Hazop
• CRS Report
• Firfighting report and dimensioning
• Risk assessment document

Oil & Gas

Gallery

 data-rellax-speed=
 data-rellax-speed=
 data-rellax-speed=

Similar projects

Go to Case Histories

Entrust your project to our team of high qualified professionals
Contact Us