- ENI
- Detail Engineering
- Taranto
- 2018
Project to expand the number of Aircoolers present between Pickets 7 and 14, in particular the addition of the Aircooler E-1419 Q-R / S-T between pickets 6-7 and 14-15 on the
structure in question at elevation +15,500. The intervention also includes the expansion of the walkway floor below the new Aircoolers with an elevation of +11,000