Interventions in the WBS1 Taranto Contingency Plan activities, including detail engineering for the upgrading of the logistic (storage, handling and ships loading) of the bitumen

  • ENI
  • Detail Design
  • Taranto
  • 2017

Detailed engineering activities to increase the shipment of bitumen by sea, design of two new 8″ lines to replace the 6″ ones in order to reduce load losses, installation of a new pumping unit. Adaptation of tank T-3143 previously used for fuel oil.
Adaptation of existing structures.
Elaboration of specifications divided by disciplines, design of civil works, mechanics (piping), electrical, instrumental.

Oil & Gas