- ENI
- Detail Engineering
- Sannazzaro de' Burgondi
- 2018
Detail engineering for the installation of new bitumen storage tank:
Activities:
• Data collection and basic documents
• Survey on site
• Foundation floor plan
• Floor plan for survey
• Geotechnical evaluation
• New foundation loading platform study
• Calculation report new foundation
• Construction drawings for sewer system modification
• Documents for authorization