Detailed engineering for interventions planned in WBS1 of the activities of the Contingency Plan Taranto that included:
-metallurgical revamping lines II step CDU and Vacuum
-increased reliability of empty group
-vacuum bottom circuit revamping and LVGO TSTC cutting
-interventions on washing circuit gas with amine
-increased reliability claus 2700
-increased capacity claus 2000 and connection to new HCR