- ENI
- Basic Design
- Sannazzaro de' Burgondi
- 2016
Detailed engineering for the installation of a new GARO compressor:
- Documents research
- Survey on site in order to verify the state of the fact
- Verification of the process
- Construction design for the foundations of the new compressor and piping support structures
- Design of piping support carpentry
- Mechanical design of the pipes at the service of new equipment (sketches, piping plants, support plants, etc.);
- Electrical design for the supply of new equipment;
- Instrumental design
- Execution of geognostic surveys for the execution of the calculations works in reinforced concrete
- Authorizations