Installation of n. 4 the new air coolers E-1419 Q/R/S/T – Contingency Plan Project

  • ENI
  • Detail Engineering
  • Taranto
  • 2018

Project to expand the number of Aircoolers present between Pickets 7 and 14, in particular the addition of the Aircooler E-1419 Q-R / S-T between pickets 6-7 and 14-15 on the
structure in question at elevation +15,500. The intervention also includes the expansion of the walkway floor below the new Aircoolers with an elevation of +11,000