- ENI
- Detail Design
- Taranto
- 2017
Detailed engineering activities to increase the shipment of bitumen by sea, design of two new 8″ lines to replace the 6″ ones in order to reduce load losses, installation of a new pumping unit. Adaptation of tank T-3143 previously used for fuel oil.
Adaptation of existing structures.
Elaboration of specifications divided by disciplines, design of civil works, mechanics (piping), electrical, instrumental.