- INALCO
- Multidisciplinary Engineering
- Pisticci
- 2018
The purpose of the engineering activities were the monitoring, studies and verifications carried out on the water purification plants of the Pistoia plant in order to improve efficiency so that to have always compliance with the regulatory values of the effluents from the plants, as well as the possibility of carrying out studies to make plant improvements to the current system of the plant production process.