- ENI
- Detail Engineering
- Taranto
- 2016
Detailed engineering aimed at calculate the stability of the 40″-62BD100-11A line carried out according to the NTC 2018, following the supersymmetric checks carried out during the plant stop, to verify and establish the residual life of the same and plan any control plans and maintenance interventions.