- ENI
- Basic Engineering
- Taranto
- 2013
For the three plant units U6100, U6200 and U6700, an analysis of the streams was carried out, with identification of the chemical composition, concentration, flow rate and duration of the event; the process verification of the acid and hydrocarbon blow down networks made it possible to evaluate their efficiency.